Skyline Group
HOME
ABOUT US
RESIDENTIAL
INDUSTRIAL/COMMERCIAL
DISABLED ADAPTATIONS
DOMESTIC
EDUCATION
CONTACT
GALLERY
CASE STUDIES
Skyline Group
HOME
ABOUT US
RESIDENTIAL
INDUSTRIAL/COMMERCIAL
DISABLED ADAPTATIONS
DOMESTIC
EDUCATION
CONTACT
GALLERY
CASE STUDIES
More
  • HOME
  • ABOUT US
  • RESIDENTIAL
  • INDUSTRIAL/COMMERCIAL
  • DISABLED ADAPTATIONS
  • DOMESTIC
  • EDUCATION
  • CONTACT
  • GALLERY
  • CASE STUDIES
  • HOME
  • ABOUT US
  • RESIDENTIAL
  • INDUSTRIAL/COMMERCIAL
  • DISABLED ADAPTATIONS
  • DOMESTIC
  • EDUCATION
  • CONTACT
  • GALLERY
  • CASE STUDIES

CONSTRUCTION & REFURBISHMENT IN EDUCATION



We understand the unique challenges and requirements of educational construction and refurbishment projects. 


Our extensive experience in the education sector allows us to deliver high-quality new build and refurbishment projects that enhance the learning environment and educational spaces while minimising disruption to students and staff. 


We have experience working with private schools, state schools, as well as universities and colleges, so we have a high-level understanding of the needs of each learning environment.

RECENTLY COMPLETED EDUCATION PROJECTS

Weston Park Pre School

HSDC South downs College

HSDC South downs College

  West Park Pre-School underwent a refurbishment of its front and back elevations to enhance appearance and durability. The works involved removing existing fibreboard cladding and installing modern, low-maintenance composite slatted cladding, improving weather resistance and giving the building a refreshed, contemporary look. All works were carried out with minimal disruption to the pre-school’s daily operations 

Learn More

HSDC South downs College

HSDC South downs College

HSDC South downs College

 The maintenance work at South Downs College involved repairs to the flat roof and cladding of the building. The flat roof repairs were crucial in addressing issues related to water leakage and insulation, ensuring that the structure remained protected from the elements and maintained its energy efficiency. The cladding repairs focused on restoring the exterior façade, which contributes to the overall durability and weather resistance of the building.

Learn More

Dinley's Promise School

Dinley's Promise School

Dinley's Promise School

 Installed commercial gully pipework and manholes to ensure proper roof drainage and prevent water accumulation at the front entrance. Work involved hand-digging two square meter holes, installing two manholes, new pipework, and two commercial gullies, then laying shingle around the pipes. Holes will be backfilled with type 1 stone and topped with tarmac. 

Learn More

Bramley Primary School

Dinley's Promise School

Dinley's Promise School

 Refurbishment works at Bramley School involved installing fire-resistant partitions and fire doors, removing carpets, repairing and preparing walls, adding low-level MDF boxing, fitting manhole  covers, and decorating Room 105, while Room 21  saw the construction of a stud around data cables, installation of a metal partition, wall preparation and painting, and a new stud partition above the frame. 

Learn More

Copyright © 2025 Skyline Group - All Rights Reserved.

Powered by

  • HEALTH & SAFETY POLICY

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept